Bespoke speed gate in polished stainless steel
Installation of EasyGate SPD-R as an access control system is in a newly built and Brisbane’s tallest building with 44 floors.
The building will be the Queensland Governments new premise and is regarded as the ‘tower of power’.
The EasyGate cabinets are clad in polished stainless steel, the same material is used for all lift doors and some detailing on the main reception counter. The turnstiles have Schindler Lift display built in and visitor card return features. There are 3 lift banks in the building and each lift bank has 3 lanes in the front and 2 lanes at the back – 15 lanes in total.
Do you have any questions or a product inquiry? Please reach us via our contact form and your request will be forwarded to the responsible team. You will be contacted soon.
If you are interested in sending a BIM file, please provide your details. We’ll get in touch with you as soon as possible.
Please provide your details. We’ll get in touch with you as soon as possible.
Email: sales@macegulf.com / info@cominfo.ae
Tel: +974 4437 0292
Website: www.cominfo.ae / www.macegulf.com
Address: Ramada Junction, Al Emadi Building, 3rd Floor, Apt. No. 7, Doha, Qatar.
Location: https://goo.gl/maps/2cu8oKNB1KGWDMiKA